How much does it cost to replace a roof in the us.
How long does 1900 sqft roof take.
All numbers in the chart were calculated based on standard installation and do not include any roof repair work.
For bigger homes expect the installation to take a few more days.
Type of roof decking used.
Home to take anywhere from 1 3 days.
For the above estimation the area considered is 35 40 sq.
Enter the approximate value for how many square feet the house has in the first number box.
Replacement rotten wood rafters reinforcement installation.
All other conditions such as weather inspection time availability of materials etc.
1 average replacement time calculated as an approximate time in days for a professional roofing crew to remove old and install 35 40 squares of new roofing materials on simple gable or hip roof with up to 8 12 pitch.
For homes that are less than 1200 sq.
Many homes have an asphalt shingle roof but some have wood metal tile and slate which can be more expensive.
The type of roof decking can also dictate how much time it takes to replace a roof albeit at a smaller extent.
Most roofing materials like asphalt shingles will usually take 2 3 days to install on your average residential roof of 1600 square feet.
How long does it take to replace a roof.
But whether we are replacing our roof or repairing it we still have to be mindful of the following variables that will affect how long it will take to install our roof.
The average roof is 3 000 square feet or around 30 squares.
Ft installation can take a day.
Roofing material is estimated by the square which is equal to 100 square feet.
According to home advisor in 2018 it will cost on average 6 600 to install a new roof.
A 4 12 pitch is relatively easy to walk an 8 12 is very difficult to walk and a 12 12 is impossible to walk.
And the crew size considered is of 5 people.